Xiaomi Mijia Smart Laser Rangefinder Real time Distance Meter LCD Display Laser Range Finder Tape Measure
-
DetailXiaomi Mijia Smart Laser Rangefinder Real time Distance Meter LCD Display Laser Range Finder Tape Measure Work With Mi Home
Mijia Smart Laser Rangefinder
Real time Distance Meter
3mm High Precision
Real Scene Smart Measurement
Data Cloud Storage
High-precision Measurement
Mijia APP Smart Measurement
Full Power Measurement 3000 Times
Industrial Grade Durability Test
Real time Distance Meter
After the laser is fired in real time, the rangefinder will display the current length in real time. Choose a precise and stable second class laser, as close as 5m and as far as 40m.
Double-issue Single-receive , mm Measurement Accuracy
Double-issue Single-receive , Laser Accuracy
House Measurement , Soft Package Measurement
Decoration Measurement , Furniture Measurement
Mijia APP , Multiple Functions
Connect the mobile phone via Bluetooth and link with the Mijia app to realize data synchronization/remarks, length/area/volume calculation, floor plan surveying and mapping, drawing sharing and other functions.
* Rangefinder to connect the Mijia app, need 6.9.200 version or higher.
Floor Plan / Real Scene Painting Measurement
You can directly draw a floor plan in the Mijia APP or take real photo and then draw and measure. The measured data is automatically marked to the selected line, APP intelligently adjusts the length of the line according to the marked data.
Area / Volume / Length Calculation
You can flexibly select the existing length, width, and height data for area and volume calculations, and you can also simply add and subtract to calculate the length.
Remote Measurement
The mobile phone can be used as a "distance finder remote control" to remotely control the rangefinder
measurement. It is suitable for the scene where the rangefinder/human-machine separation must be placed at a fixed point.Single Button Design
Long press for 2s to turn on, short press to start measurement, double click to switch between front and back benchmarks.
Long Press 2s - Turn on/offShort Press - Start/end measurement, record measurement data
Double click - Before and after switching benchmarks
High Brightness LCD Screen
High Brightness LED Screen , Display of current measurement data, historical measurement data, measurement reference, measurement unit, power, and Bluetooth connection status.
Measurement standard/laser emission reminder
Bluetooth connection status
Electric quantity
Historical measurement data
Current measurement data
Unit of measurement (M/FT)
Double Matte Material , Anti-wear Scratch-resistant
Aluminum alloy + high-strength engineering plastics, dual materials to create a matte appearance.
Wireless Charging Design
Type-C Charging Long Battery Life
370mAh Large capacity lithium battery , 3000 sets of data can be measured at full power
Specifications
- Power Type
Rechargeable
Brand Name
MIJIA - Origin
Mainland China
Product Parameter
Product model: MJJGCJYD001QW
Size: 80 x 35 x 21mm
Net Weight: about 60g
Measuring range: 0.05-50m
Measurement accuracy: ± (3mm + 5 x 10^(-5) D*)
Charging parameters: 5V-1A
Minimum display unit: 0.001m
Bluetooth transmission distance: about 8m (barrier-free)
Package List:
1 x Laser rangefinder
1 x Charging Cable
1 x Manual
- Power Type
-
Customer Reviews
D***el 2024-07-29
Shipped fast, packaged well. Great seller. Will buy from again.
G***ge 2024-07-27
Received much earlier than expected.
J***s 2024-07-24
quick supply, helpful customer service
O***r 2024-07-23
Very satisfied, hope to have more occasions to interact with tis seller
T***as 2024-07-19
Great prices, quick shipping, A+ 5⭐👍 All good! Works as described